Major projects - World
Oil & Gas
Water supply
Industry
Engineering, fabrication, installation and start-up of 400 m3/h vapour recovery unit for Yiwan - Shenzhen tankfarm.
Engineering, fabrication, installation and start-up of 400 m3/h vapour recovery unit for Zhishan tankfarm.
Delivery of blending unit EVA 6, SKID service and bottom loading trucks technology.
Design, delivery and engineering of additive dosing system EVA6, additive pump station and loading arms on taktruck terminal.
Water supply and sewage control system in Guayaquil - Ecuador (2,5 mil inhab.). Guayaquil is major ecuadorian trade and transport centre.
In 2005 was installed approx. 20 remote telemetry units and installed radio data network and central control room based on system SCADA SCX.
The system is under permanent development. In 2010 is in following state:
- connected approx. 70 objects
- using 2 servers (in different locations) in hot-standby mode
- communication over radio data network and GPRS
- integration of 3rd party systems (PLC controllers, datalogers)